Mapping Comments

CityUnion
Ordinance2005-005
CommentsTHERE WERE 2 SETS OF DESCRIPTIONS INCLUDED IN THE FILING. THE FIRST SET OF CALLS (INCLUDES 4 TRACTS AND SOME EXCEPTIONS) HAD BAD SURVEY CALLS, DID NOT MATCH THE PLAT AND WERE UNUSABLE. THE SECOND SET OF CALLS (DONE BY RIEGLER ENGINEERING) WORKED AND MATCHED THE SHAPES ON THE PLAT. SOME OF THE CALLS ON THE PLAT WERE INCORRECT, USED CALLS FROM THE DESCRIPTION. DOES NOT APPEAR TO BE CONTIGUOUS WITH EXISTING BOUNDARY